UNICORN CONTRACTS your online bid office

Mistakes that get a bid excluded

Most bids are excluded for formal mistakes made close to the deadline, not for the quality of the company: late or unsigned uploads, a missing or wrong bid bond, missing labour and safety costs, price information inside the technical offer, conditional offers and requirements not held at the deadline (Directive 2014/24/EU; Legislative Decree 36/2023).

Most exclusions do not depend on the quality of the company. They depend on formal mistakes made in the last hours before the deadline. Here are the most frequent, with the rule behind each.

Late or incomplete upload

Bids are submitted through electronic platforms and the deadline is to the minute. A file still uploading at the deadline is a bid not submitted. Upload at least a day early and check the receipt the platform issues.

Price information in the technical offer

Quality is evaluated before price. A figure that reveals the price in the technical envelope can lead to exclusion, because it breaks the separation of the two evaluations.

Missing labour and safety costs

In Italy the price offer must state the bidder's labour costs and its company safety costs, under penalty of exclusion (article 108, paragraph 9, of Legislative Decree 36/2023), with exceptions for supplies without installation and intellectual services. This cannot be fixed afterwards.

Invalid digital signature

Documents must be signed with a valid qualified signature by the legal representative or by an attorney whose power of attorney is attached. An expired certificate or the signature of a person without powers is a frequent problem.

Conditional or partial offers

Adding reservations, alternative conditions or changes to the contract terms usually makes the offer inadmissible. So does an offer that does not cover all the items of the lot.

Requirements not held on the deadline

Requirements must be held on the deadline for offers and kept for the whole procedure. Certifications that expire, a registration not yet obtained or a reliance contract signed after the deadline are common causes of exclusion.

False statements

A false statement in the ESPD is itself an exclusion ground (Directive 2014/24/EU, article 57, paragraph 4). When in doubt, declare and explain.

A checklist before uploading

  • every document requested is present and signed;
  • the price offer contains discount, labour costs and safety costs;
  • the technical offer respects page limits and contains no prices;
  • the guarantee, where required, has the right amount, duration and form;
  • the receipt of submission has been saved.

Find the open tenders that suit your company

Enter your VAT number or website: the free search shows the open public tenders near you that match your sector, with value and deadline.

Start the free search

When you find a tender you want to bid for, our bid office can prepare the complete turnkey bid, ready to sign.

Frequently asked questions

Can a missing document always be added later?

Only administrative documents, within the limits of the clarification procedure. The technical and price offers cannot be completed after the deadline.

Is a bid uploaded one minute late accepted?

No. The deadline is binding for all bidders and platforms record the exact time of submission.

Who must sign the bid?

The legal representative, or an attorney with a power of attorney attached to the documents.

Official sources

  1. Directive 2014/24/EU of 26 February 2014 on public procurement, EUR-Lex, consulted on 18 November 2026
  2. D.Lgs. 31 marzo 2023, n. 36, Codice dei contratti pubblici, Normattiva, consulted on 18 November 2026
  3. D.Lgs. 36/2023, art. 101, Soccorso istruttorio, Normattiva, consulted on 18 November 2026
  4. D.Lgs. 36/2023, art. 108, Criteri di aggiudicazione, Normattiva, consulted on 18 November 2026

General information on public procurement rules, not legal advice. Always check the tender documents and the law in force on the day you bid.

Other guides

Glossary of public procurement

ESPD, bid bond, abnormally low tender, lots, CPV: the terms of public tenders explained with the legal references.

Glossary