How to prepare a technical offer that scores points

A technical offer scores points when it answers every award criterion and sub-criterion of the tender documents, in the same order and within the page limits, with measurable commitments the buyer can verify; under the most economically advantageous tender quality often weighs more than price (Directive 2014/24/EU, article 67).

In most tenders awarded on price and quality the technical offer weighs far more than the price. Points are not given for a good company description: they are given for clear answers to the criteria the buyer has written.

Start from the award criteria

Directive 2014/24/EU (article 67) allows buyers to award on the most economically advantageous tender, which includes quality, environmental and social aspects. In Italy this is the general rule (article 108 of Legislative Decree 36/2023), and for labour intensive contracts the buyer sets a maximum of 30 per cent for the price score. The tender documents list the criteria, the sub-criteria, the points of each and often the method used by the evaluation board.

Turn this table into the outline of your offer: one section for each criterion, in the same order and with the same titles. The board must find each answer quickly.

Answer what is asked, with evidence

  • Describe how you will do this contract, not what your company does in general.
  • Give measurable commitments: response times, staff assigned, frequencies, controls, reports.
  • Support each claim with something verifiable: certifications, curricula, equipment lists, previous similar contracts.
  • Use the buyer's own terms from the specifications, so the link between your answer and the criterion is obvious.

Respect the formal rules

Page limits, font sizes and the number of characters are not details. Many tender documents state that pages beyond the limit will not be read. Check also that the technical offer contains no price information: a price figure in the technical envelope can lead to exclusion, because it breaks the separation between quality and price evaluation.

Improvements and commitments

Many criteria reward improvements over the minimum requirements of the specifications. Offer only what you can deliver: improvements become contract obligations and the buyer can apply penalties if they are not met.

A final check

Before uploading, read the offer with the criteria table beside it and give yourself the score a strict board would give. Any criterion without a clear answer is points left on the table.

Find the open tenders that suit your company

Enter your VAT number or website: the free search shows the open public tenders near you that match your sector, with value and deadline.

Start the free search

When you find a tender you want to bid for, our bid office can prepare the complete turnkey bid, ready to sign.

Frequently asked questions

How long should a technical offer be?

As long as the documents allow and no longer. When there is a page limit, use it to answer every sub-criterion rather than to describe the company.

Can I attach brochures and catalogues?

Only if the documents allow annexes. Material that is not requested, or that exceeds the limits, is often not evaluated.

Is the technical offer anonymous?

Usually not, but some procedures, such as design contests, require anonymity: then any element that identifies the company must be removed.

Official sources

  1. Directive 2014/24/EU of 26 February 2014 on public procurement, EUR-Lex, consulted on 18 November 2026
  2. D.Lgs. 31 marzo 2023, n. 36, Codice dei contratti pubblici, Normattiva, consulted on 18 November 2026
  3. D.Lgs. 36/2023, art. 108, Criteri di aggiudicazione, Normattiva, consulted on 18 November 2026

General information on public procurement rules, not legal advice. Always check the tender documents and the law in force on the day you bid.

Other guides

Glossary of public procurement

ESPD, bid bond, abnormally low tender, lots, CPV: the terms of public tenders explained with the legal references.

Glossary